Preparing Turner Gear Units for the Next Installation

Our team is currently assembling and testing a new batch of Turner Gear units, which will soon be heading out to a wind turbine installation site.

Each unit is carefully built and thoroughly tested in our workshop before it leaves – making sure everything is fully operational when it arrives on site. That level of preparation makes a real difference when the equipment needs to perform under demanding installation conditions.

 

A Turner Gear controls the rotation of the rotor while wind turbine blades are mounted one by one – and is an essential tool for carrying out the installation safely and precisely. Without it, simply put, there is no way to do the job properly.

This batch is almost ready. Next stop: installation site.

Find out what a Turner Gear is and how it works

 

AS SCAN technician inspecting a Turner Gear unit packed in a transport container ready for shipment to a wind turbine installation site.

AS SCAN technician mounting a hydraulic panel on a Turner Gear control station during assembly in the workshop.AS SCAN technician connecting hydraulic components on a Turner Gear control station during assembly at the workshop.

 

Send an e-mail